1级性生活片,美女黄大片,极品美女被弄高潮视频网站,免费看美女隐私部位网站

HOME> SOLUTIONS & PRODUCTS> Energy
The Ability of Ensure Adequate Energy Supply

South Open-Pit Coal Mine has a simple geological structure, shallow buried thick coal seam and, stable and huge reserves.
The designed capacity of South Open-Pit Coal Mine for Phase I is 10 million tons/year, Phase II 20 million tons/year. The design concept is green, digital and intelligent. Now TBEA has invested nearly 3 billion RMB to build million-tons open-pit coal mine production system. The Surface Production System act as an very important role of the production system: the ground production system mainly includes the crushing, storage, rail loading, auto loading and belt conveyor transportation production. Loading part includes two parts, the turn between train and truck station. TBEA has a train station including the buffer warehouse, quantitative warehouse, steel structure, sampling system, hydraulic system and control system with loading capacity of 5000 t/h. The gondola car just need 40 seconds single section loading time. The rail loading capacity is 10 Mt/a. And TBEA also have two fast-loading stations for trucks. The station bin has the capacity of 200 t. The warehouse has a loading gate with auto loading operations and set up a digital truck scale for measuring. The loading capacity of 1500 t/h. Within 8 minutes we can complete 100 ton truck shipment.

Green Mining

The Surface Production System with the capacity of 100 billion tons

Automatic Loading System

Services

The items can be carried out: total moisture determination, determination of moisture, ash content, calorific value determination, determination of total sulfur and hydrocarbon and ash melting sex determination.

IC Card Management

Silo Quick Loading System

Professional Technical Team

Testing Equipment

Blast Air Drying Oven

Intelligent Muffle Furnace

Eco-friendly

In order to create green coal mine, the mine has a closed ground production system and the coal storage silo with over 58000 trees and green area of 23 hectares, to create green mines.

Belt corridor: safe, environmental protection, energy saving . The coal conveying corridor have the ability to deliver 3000 tons per hour to guarantee the coal conveying requirements to reduce procurement costs and to achieve win-win purpose.

Public transportation:saving time, reducing the risk of loss of goods, reducing the number of traffic accidents, ease traffic pressure;Saving freight cost;Reducing the transportation pressure on road;Driving the regional economic growth;Reducing the amount of pollution on the natural environment;

Belt Corridor

Belt Corridor

Train Line

Loading of the Container

Train full of Containers leaving the Mine

彭山县| 象州县| 黄石市| 务川| 岳阳县| 仪征市| 江永县| 志丹县| 恩施市| 手游| 巨野县| 郴州市| 定结县| 五常市| 桐庐县| 浮山县| 临夏县| 汶上县| 卢龙县| 霸州市| 墨脱县| 冷水江市| 隆德县| 太康县| 迁安市| 龙海市| 攀枝花市| 武穴市| 德江县| 奉化市| 公主岭市| 太仓市| 辛集市| 托克逊县| 日照市| 合作市| 凤台县| 沾益县| 松溪县| 张家港市| 琼结县|